OMX Innovation · Deck 25 · Project Management
A project management tool that fits OMX — same Lens design, same Snowflake stack — for ~$30k/yr less than the packaged platforms.
Tier-1 to tier-4 projects, EPMO governance, status that ladders to ExCo, one place for the work.
01 / 06
Why now

The wedge.

02 / 06
What this covers

What's in scope.

01
Project shape
fields, milestones, owner, RAID, status — sized by tier
02
EPMO governance gates
tier-aware ceremony (Tier 1 = minimal, Tier 4 = full gating)
03
Portfolio rollup
ExCo / Steering Committee view of in-flight initiatives
04
Status reporting
RAG ratings, blockers, decisions needed
05
Resource view
who's on what; flag over-allocation
06
Dependency map
projects that block / are blocked by others (cross-deck context — many of these 21+ ideas have dependencies)
03 / 06
The problem

What's broken.

01
Tool fragmentation
every team picks their own; no rollup
02
Tier mismatch
Quick Tasks weighed down by Tier-4 ceremony, or Tier-4 initiatives run with Tier-1 rigour
03
No portfolio view
ExCo can't see in-flight initiatives in one place
04
Status reports are PowerPoint
manually assembled, days out of date
05
Knowledge lost
project ends, lessons-learned lost to email
06
Dependencies invisible
Project A waits on Project B; nobody surfaces it
04 / 06
The benefits

The value story.

Lever
Mechanism
Sizing
Annual reclaim vs packaged
Asana/Monday/Jira/ClickUp $20-50k → fit-for-OMX
~$30k/yr saving baseline
EPMO governance enforcement
Tier-aware ceremony built in
Right rigour for the right work
ExCo portfolio visibility
One rollup view
Faster decisions, less status-pack effort
Status report capacity
Auto-generated vs PPT-assembled
Hours per week per project lead reclaimed
Lessons learned compounding
Knowledge feeds Deck 21 + Deck 18 engines
Year-over-year capability lift
05 / 06
The ask + roadmap

What we need.

Now
Cover
project lead at console with portfolio rollup + status RAGs; calm + organised
P2
Problem vector grid (4)
: Tool-fragmentation / Tier-mismatch / No-portfolio-view / Status-by-PPT
P3
Headline saving
$30k/yr call-out tile
P4
Tier mapping
Tier 1-4 with corresponding ceremony / fields / artefacts
P5
Portfolio view mock
ExCo dashboard of in-flight initiatives + risk + dependency
Audience
Primary: CEO/GM + COO + Head of Strategy + EPMO Lead. Secondary: Project leads + Tier-2/3/4 initiative owners. Tertiary: ExCo (consumes portfolio rollup).
References
  • Memory: EPMO Operating Protocol (D:\10-CONTROLLER\jarvis\config\epmo-operating-protocol.md) — the 4-tier governance + RUN/BUILD mode framework this tool implements
  • Memory: Adaptive Governance — Tier 1 Quick Task / Tier 2 Standard / Tier 3 Complex / Tier 4 Enterprise (CLAUDE.md)
  • Memory: Project Steward supervisor + 15 specialists (CLAUDE.md) — the agent layer that uses this tool
  • Memory: Document Production Capabilities — python-pptx + auto-export pattern (D:\10-CONTROLLER\jarvis\docs\DOCUMENT-PRODUCTION-CAPABILITIES.md)
  • Memory: Deck 21 Strategic Deep Dives — lessons-learned feeds the library
06 / 06
← All decks